ChristmasCave - SACB vs. SCCB

Here's something that everyone needs to know.  A control box can be either a Stand-Alone Control Box (SACB) or a Serially-Controlled Control Box (SCCB).  It cannot be both at the same time.  However it is possible to switch by simply swapping the microprocessor chip.  It's just that easy!

This fact holds true for all of the control boxes we sell:  the assembled control box, the control box board, and the Brain board.  Thus you can have a collection of control boxes and, depending on what type of control box you need, just purchase and insert the correct type of microprocessor chip into the control box.